Tunnel Dam Hydro Station

Tunnel Dam Hydro Station is a concrete dam located in New London County, Connecticut, built in 1906. It carries a Significant hazard potential classification and has a satisfactory condition assessment.

About Tunnel Dam Hydro Station

The primary purpose of Tunnel Dam Hydro Station is hydroelectric. The dam generates hydroelectric power by channeling water through turbines, converting the energy of flowing water into electricity. The dam is owned by Firstlight Power Resources (public utility). It impounds the Quinebaug River near Preston.

The dam stands 32 feet tall and stretches 780 feet across, creates a reservoir covering 100 acres, has a maximum storage capacity of 1,650 acre-feet, and collects water from a drainage area of 744 square miles. Completed in 1906, the structure is over a century old.

This dam has a significant hazard potential classification, meaning that a failure could cause significant economic damage — flooding roads, bridges, or property downstream — but is not expected to result in loss of life. Its condition is rated satisfactory, indicating no existing or potential dam safety deficiencies are recognized. An emergency action plan is in place for this dam. The most recent inspection on record was 11/18/2021.

At 32 feet, this dam is taller than 76% of dams nationwide.

Search for dams near your address to see all dams in your area with hazard classifications and safety data.

Significant HazardSatisfactory ConditionEmergency Action Plan: Yes

Location

StateConnecticut
CountyNew London
Nearest CityPreston
River/StreamQuinebaug River
Coordinates41.55496, -72.04095

Physical Characteristics

Dam TypeConcrete
NID Height32 ft
Dam Height32 ft
Dam Length780 ft
Year Completed1906 (120 years old)

Storage & Hydraulics

NID Storage1,650 acre-ft
Max Storage1,650 acre-ft
Normal Storage1,650 acre-ft
Surface Area100 acres
Drainage Area744 sq mi
Max Discharge33,940 cfs
Spillway TypeUncontrolled

Ownership & Safety

PurposeHydroelectric
OwnerFirstLight Power Resources
Owner TypePublic Utility
Hazard ClassificationSignificant
Condition AssessmentSatisfactory
Last Inspection11/18/2021
Emergency Action PlanYes

Identifiers

NID IDCT00637
Federal IDCT00637
More InfoState Dam Safety Program

Nearby Dams