Pine Tree Brook Pl-566 Flood Control Dam

Pine Tree Brook Pl-566 Flood Control Dam is an earth dam located in Norfolk County, Massachusetts, built in 1955. It carries a Significant hazard potential classification and has a satisfactory condition assessment.

About Pine Tree Brook Pl-566 Flood Control Dam

The primary purpose of Pine Tree Brook Pl-566 Flood Control Dam is flood risk reduction. The dam is designed to control downstream flooding by temporarily storing excess water during storms and releasing it at a controlled rate. The dam is owned by Town Of Milton (local government). It impounds the Pine Tree Brook near Milton.

The dam stands 21 feet tall and stretches 1,275 feet across, creates a reservoir covering 94 acres, has a maximum storage capacity of 1,085 acre-feet, and collects water from a drainage area of 4 square miles. Completed in 1955, the structure is well into its service life at over 50 years old.

This dam has a significant hazard potential classification, meaning that a failure could cause significant economic damage — flooding roads, bridges, or property downstream — but is not expected to result in loss of life. Its condition is rated satisfactory, indicating no existing or potential dam safety deficiencies are recognized. An emergency action plan is in place for this dam. The most recent inspection on record was 11/03/2022.

Search for dams near your address to see all dams in your area with hazard classifications and safety data.

Significant HazardSatisfactory ConditionEmergency Action Plan: Yes

Location

StateMassachusetts
CountyNorfolk
Nearest CityMilton
River/StreamPine Tree Brook
Coordinates42.23554, -71.08945

Physical Characteristics

Dam TypeEarth
NID Height21 ft
Dam Length1,275 ft
Year Completed1955 (71 years old)

Storage & Hydraulics

NID Storage1,085 acre-ft
Max Storage1,085 acre-ft
Normal Storage95 acre-ft
Surface Area94 acres
Drainage Area4 sq mi
Spillway TypeUncontrolled

Ownership & Safety

PurposeFlood Risk Reduction
OwnerTown of Milton
Owner TypeLocal Government
Hazard ClassificationSignificant
Condition AssessmentSatisfactory
Last Inspection11/03/2022
Emergency Action PlanYes

Identifiers

NID IDMA00825
Federal IDMA00825
More InfoState Dam Safety Program

Nearby Dams