Peabody Coulterville/gateway/slurry Cell 5 Dam

Peabody Coulterville/gateway/slurry Cell 5 Dam is an earth dam located in Randolph County, Illinois. It carries a Low hazard potential classification.

About Peabody Coulterville/gateway/slurry Cell 5 Dam

Peabody Coulterville/gateway/slurry Cell 5 Dam is a dam in Randolph, Illinois. The dam is owned by Peabody Coulterville Mining, Llc (private). It impounds the Trib Plum Cr near Coulterville.

The dam stands 66 feet tall and stretches 6,330 feet across, creates a reservoir covering 120 acres, has a maximum storage capacity of 505 acre-feet, and collects water from a drainage area of 0 square miles.

This dam has a low hazard potential classification, meaning that failure would cause minimal damage, limited primarily to the dam owner's property, with no expected loss of life. An emergency action plan is in place for this dam. The most recent inspection on record was 09/04/2024.

At 66 feet, this dam is taller than 96% of all dams in the United States.

Search for dams near your address to see all dams in your area with hazard classifications and safety data.

Low HazardNot Available ConditionEmergency Action Plan: Yes

Location

StateIllinois
CountyRandolph
Nearest CityCoulterville
River/StreamTrib Plum Cr
Coordinates38.17808, -89.65048

Physical Characteristics

Dam TypeEarth
NID Height66 ft
Dam Height66 ft
Dam Length6,330 ft

Storage & Hydraulics

NID Storage505 acre-ft
Max Storage505 acre-ft
Normal Storage166 acre-ft
Surface Area120 acres
Drainage Area0 sq mi
Spillway TypeUncontrolled

Ownership & Safety

PurposeOther
OwnerPEABODY COULTERVILLE MINING, LLC
Owner TypePrivate
Hazard ClassificationLow
Condition AssessmentNot Available
Last Inspection09/04/2024
Emergency Action PlanYes

Identifiers

NID IDIL50648
Federal IDIL50648
More InfoState Dam Safety Program

Nearby Dams